At JP Pools, We as expert pool builders specialize in high-quality pool construction, offering expert craftsmanship in shotcrete/gunite application, tile, pebble finishes, pavers, rebar, and plumbing. Below is a comprehensive breakdown of how each component is installed, ensuring a durable and long-lasting pool.
Gunite is a high-strength, spray-applied concrete mixture that forms the structural shell of your pool. It provides unmatched durability and allows for pool construction custom shapes and designs.
Gunite Installation Process:
• Excavation & Framing – The pool area is carefully excavated, and temporary framing is set up to define the shape.
• Rebar Installation – A steel rebar grid is placed throughout the pool to reinforce the structure
• Gunite Spraying – A pressurized hose sprays a mix of cement and sand, which is hydrated at the nozzle to create a thick concrete coating.
:Shotcrete Spraying - A pressurized hose sprays a concrete mix with all the aggregate already hydrated and mixed once it is sprayed it is ready to create a thick concrete coating
• Shaping & Smoothing – Skilled technicians sculpt and smooth the gunite before it hardens.
• Curing Process – The gunite cures over 7 to 14 days, requiring daily watering to insure proper curing and no cracking.
during pool construction a water line tile add both beauty and protection to your pool’s interior. Process includes:
• Surface Preparation – The gunite surface is cleaned and prepped for proper adhesion.
• Applying Thin-Set Mortar – A high-strength bonding mortar is applied.
• Tile Placement – Each tile is carefully aligned for a seamless look.
• Grouting – Waterproof grout is applied to fill gaps and secure tiles.
• Final Sealing & Curing – The grout is cured to enhance durability.
Pebble finishes are a pool builders premium pool interior finish, offering a natural, textured look with enhanced durability.
Pebble Installation Process:
• Mixing the Pebble Finish – A combination of natural pebbles, cement, and bonding agents is prepared.
• Application – The mixture is sprayed and hand-applied over the pool shell surface.
• Smoothing & Exposing Pebbles – Technicians use a water wash technique to expose the pebbles, creating a slip-resistant surface.
• Curing & Sealing – The finish is left to cure, then sealed for added protection.
Pebble finishes come in various colors and aggregate sizes, providing a luxurious, long-lasting surface.
Rebar is the structural backbone of your pool construction ensuring strength and longevity.
Rebar Installation Process:
• Rebar Grid Placement – Steel bars are arranged in a grid pattern, typically spaced 8-12 inches apart.
• Tying & Securing – The rebar is tied together to prevent shifting.
• Inspection & Approval – The structure is inspected before the gunite is applied.
Rebar reinforcement prevents cracks, leaks, and structural failures over time.
A properly installed plumbing system ensures efficient water circulation, filtration, and heating.
Plumbing Installation Steps:
• Trenching & Pipe Placement – Trenches are dug around the pool perimeter, and schedule 40 PVC pipes are laid for durability.
• Main Drain, Skimmer, & Return Line Installation –
• Main drains pull water from the pool for filtration.
• Skimmers remove debris from the water’s surface.
• Return lines circulate clean water back into the pool.
• Pressure Testing – The plumbing is tested for leaks before the gunite application.
• Equipment Hookup – Pipes are connected to the pump, filter, and heater system for optimal performance.
Us as pool builders specialize in creating, custom pools installing shotcrete, tile, plastering, pebble finishes, pavers, rebar, and plumbing all pool construction. Our expert team ensures every aspect of your pool is built to last, from structural reinforcement to stunning finishes. With years of experience and a commitment to excellence for you to enjoy
JP Pools
Copyright © 2018 JPerez LLC JP Pools - All Rights Reserved.